Home | Mobile | E-Mail Us | Privacy | Mtn Bike | Ride Director Login | Add Century/Benefit Rides
Home

Mid-Month Friday Ride

Friday, September 15, 2017

2/T/28 Leader: Lucy Glover  lucy.glover49@gmail.com   (970) 668-8535 Leader: Randy Glover  glover.randy@gmail.com   (970) 485-1914 Meet at 9:15 am for a 9:30 am start Start Location: Rockridge BART This is a no drop social ride for experienced riders with a designated sweep. We’ll pick up additional riders at the North Berkeley BART promptly at 10:00am. We'll keep this ride super friendly for a 28.5 mile ride with approximately 1500 feet of climbing. We ride on the Ohlone Greenway through Berkeley, Albany and El Cerrito before joining the I-80 trail to El Sobrante. Continue riding through El Sobrante to Orinda on San Pablo Dam, then St. Stephens Trail to luinch in Lafayette. Rest stop at Starbucks in El Sobrante. Lunch in Lafayette at Rustic Tavern unless temps are high, then lunch at Geppetto’s in Orinda. RSVP requested for lunch but not required for ride only. Take Lafayette or Orinda BART back to start. Route Maps available and cue sheets available at ride. GPS route is at https://ridewithgps.com/routes/24015599.

E-mail:

Club: Grizzly Peak Cyclists click for this clubs Click for Rating

Type: Road  Where: East Bay

Ride 2 of 7

 



Rides
View All

Century's
View All

Links
Commercial
Bike Sites
Teams

Other
Advertise
Archive
Privacy
Bike Reviews

Bill
All Columns
About Bill

Bloom
All Columns
Blog

About Naomi

© BikeCal.com 2016